The bricks on the existing structure are no longer in production but the architect has been working hard to locate one that matches closely. The top picture on the left is of the third "brick test" currently being conducted. The second picture is of the current atrium which is being converted to a technology center.
-Sabrina Robertson
Nassau County Manager's Office